We have a requirement to construct 6 x 40m diameter stainless steel water treatment process tanks. The tanks are 6m high and will be on a concrete base.
The tanks will be welded and I wish to know the following:
1. Best choice of stainless steel (raw water is from a non saline river so chlorides are very low)
2. Weld preparation requirements
3. Post weld pickling procedure
Appreciate this is a sizable construction program and I need to ensure procedures are written and strictly adhered to. The tanks must not show any sign of rusting during the 20 year asset life or be subject to any kind of corrosion due to poor quality welding procedures.
Best Regards
John
The tanks will be welded and I wish to know the following:
1. Best choice of stainless steel (raw water is from a non saline river so chlorides are very low)
2. Weld preparation requirements
3. Post weld pickling procedure
Appreciate this is a sizable construction program and I need to ensure procedures are written and strictly adhered to. The tanks must not show any sign of rusting during the 20 year asset life or be subject to any kind of corrosion due to poor quality welding procedures.
Best Regards
John