colesa

Chemical
Jan 9, 2006
2
GB
I am assisting in the commissioning of a small forced draft 150 psi 3000 lb/hr package boiler at a steam engine museum. We do not have a write up on the boiler combustion control system - my main worry is the initial purge time and purge after failed ignition. Can any one point me in right direction please. .

 
Replies continue below

Recommended for you

I'd try a few boiler manufacturers; Babcox & Wilcox, Combustion Engineering (if my memory's any good), I'm not sure how variable the tables will be, but you can always "double or triple" a typical set of parameters.

I'll try to remember to ask a collegue tomorrow; he'll probably remember typical purge tables from memory!
 
Get a copy of ASME Safety Standard CSD-1 and NFPA 85 series. All your concerns will be answered.
 