sigma1525
Structural
- Dec 21, 2010
- 18
Not sure if this is the right forum but I will try.
We have a steam pipe crossing a seismic expansion joint between two building with differential building movements but the Mechanical EOR doens not want to provide flexibility into his/her system and obviously, the owner takes their advise and does not want to provide anything extra.
Based on our analysis the piping is not flexible enough but the EOR refuses to accept our recommendation.
Any recommendations will be appreciated