mechmanx77
Chemical
- Aug 16, 2007
- 2
Hi Every one
I wan to know if there is any rule dictated by ASME or API codes calling for including the steam purging (S/out) condition in the design of tanks? so is there any rule or relation of design parameters like pressure, temp or thickness or service condition to decide whether to consider steam purging connection?
I wan to know if there is any rule dictated by ASME or API codes calling for including the steam purging (S/out) condition in the design of tanks? so is there any rule or relation of design parameters like pressure, temp or thickness or service condition to decide whether to consider steam purging connection?