I wonder if someone out there could help or point me in the right direction.
Where can I find installation times (unload, set, align, piping, electrical, testing, start-up etc.) for steam (750 psig) turbine/generator units in the 2MW to 5MW range.
I have a standard man-hour labor rate book (by J S Page) which tells me that 17,000 hrs is right for a 2MW unit and going up to 22,500 hrs for a 5MW unit but these hours seem horrendous to me. Perhaps they’re not; this is somewhat outside my bailiwick.
Thanks.