In our solar power plant where we have a 50MW ST we need minimum 30ºC superheat in HP an 50ºC in LP.
Our current startup procedure is as follows.
* Sun comes up
* Start up SG
* open HP bypass manually 5%
* LP remains closed
* LP vent open
We then wait for conditions for around 90 minutes. I think is being done incorrectly and it takes far too long.
I believe we should use the HP bypass and LP bypass to flow steam and not the vent.
Any ideas?
In our solar power plant where we have a 50MW ST we need minimum 30ºC superheat in HP an 50ºC in LP.
Our current startup procedure is as follows.
* Sun comes up
* Start up SG
* open HP bypass manually 5%
* LP remains closed
* LP vent open
We then wait for conditions for around 90 minutes. I think is being done incorrectly and it takes far too long.
I believe we should use the HP bypass and LP bypass to flow steam and not the vent.
Any ideas?