Currently, I have a big issue in my petrochemical plant. I have 60meter-height steel stack which has been inclining. So far, we have inspection program (measure the misalignment) every 2 weeks. The result shows that it is getting more incline. But I don't know what is the criteria that we should stop the operation and start repairing.
Anyone has any standard about the incline of stack ? Please help me
Currently, I have a big issue in my petrochemical plant. I have 60meter-height steel stack which has been inclining. So far, we have inspection program (measure the misalignment) every 2 weeks. The result shows that it is getting more incline. But I don't know what is the criteria that we should stop the operation and start repairing.
Anyone has any standard about the incline of stack ? Please help me