ParabolicTet
Mechanical
- Apr 19, 2004
- 69
I inherited an input deck that has this step after the first step of applying bolt pre-load. Unfortunately I am not sure I understand its purpose. fyi , node 90001 is a pre-tension node.
*STEP,INC=1
Step 2: Substitute bolt load with resultant length change
*STATIC
.1,1
*BOUNDARY, FIXED
900001, 1,
*CLOAD,OP=NEW
*END STEP
*STEP,INC=1
Step 2: Substitute bolt load with resultant length change
*STATIC
.1,1
*BOUNDARY, FIXED
900001, 1,
*CLOAD,OP=NEW
*END STEP