eegyman5000

Petroleum
Dec 24, 2007
7
if a P No.1 vessel is heat treated as a client requirement
(thikness 16 mm)
after that it was needed to fix a plate on the shell from OUTSIDE the, plate will be welded by fillet weld
will this impact the forgoing stress relieving process
and if we should re-PWHT,should this be applicable to wole vessel or just newly welded area of fillet weld

 
Replies continue below

Recommended for you

Yes, if the client requires it. Review ASME Section VIII, Div 1 UW-40, and UCS-56 for local PWHT guidance.
 
sometimes the user will forego the local PWHT if the additional weld is perfomed in accordance with UCS-56 with proper preheat and the weld size is small.

But since this is a client requirement, he will have to approve the procedure. And the AI will have to approve welding after PWHT as well.
 