judeotuks
Structural
- Jan 14, 2013
- 18
I will be going for a site visit of an existing offshore platform which is to be linked to another platform (proposed) via a bridge connection.
Please does anyone have a typical verification checklist from a structural point of view?
Please does anyone have a typical verification checklist from a structural point of view?