KingKongdoor
Structural
- Nov 1, 2015
- 29
How would you go about connecting a structural foundation supported by piers for a new building that ties into an existing building with a slab on grade foundation. I would prefer to allow the structures to move independently but that could get ugly with doors and corridors crossing the tie-in. The existing building is about 30 years old.