amicka
Civil/Environmental
- Aug 2, 2005
- 18
I'm designing an infiltration area below a large, looped driveway area so that the post-developed 10-year flow will equal the pre-developed 2-year flow.
I am placing two inlets in the driveway area so stormwater can flow into the infiltration bed more quickly, rather than just seeping through the ground surface. I tried to model the system as follows: subcatchment to catch basin (with 2 grates as my primary outlets and a broad-crested weir to represent overland flow as my secondary outlet) to an infiltration bed, where infiltration is the only outlet.
I keep getting an error message because infiltration is my final outlet and no calculations are completed. Even when I add a "dummy" outlet (1" diameter orifice) from my infiltration bed, all the flow goes through the dummy outlet.
Another issue with this system is using the broad-crested weir to model the runoff that does not flow into the infiltration system. Is there a better way to quantify this flow? This is the flow rate I need to show that the SWM system meets the 10-year to 2-year requirement.
Can anyone out there help me figure out how to model this so I won't get any error or warning messages?
I am placing two inlets in the driveway area so stormwater can flow into the infiltration bed more quickly, rather than just seeping through the ground surface. I tried to model the system as follows: subcatchment to catch basin (with 2 grates as my primary outlets and a broad-crested weir to represent overland flow as my secondary outlet) to an infiltration bed, where infiltration is the only outlet.
I keep getting an error message because infiltration is my final outlet and no calculations are completed. Even when I add a "dummy" outlet (1" diameter orifice) from my infiltration bed, all the flow goes through the dummy outlet.
Another issue with this system is using the broad-crested weir to model the runoff that does not flow into the infiltration system. Is there a better way to quantify this flow? This is the flow rate I need to show that the SWM system meets the 10-year to 2-year requirement.
Can anyone out there help me figure out how to model this so I won't get any error or warning messages?