RavenJoe
Electrical
- Nov 26, 2001
- 17
I have a 100 amp 30 pole 3 phase 4w main 208/120 lighting panel. Fed by a 30 KVA transformer. This is an industrial application. Can I install a 3 phase 100 amp subpanel or should I go with a 60 amp ? What is the code on this and what is the article in the NEC?