Hi all.
I am investigating a concrete frame structure and have discovered the footings are undersized excessively, more than 3 times overstressed. I am working up ways to fix the problem. I can deal with bearing and bending fairly easily, but am having some questions about how to strengthen the footing for both one-way and two-way shear.
I have 16"x16" concrete columns bearing on a continuous strip footing at approx 18' centers. The footing is 4' wide and 16" deep, with a single layer of steel at mid-height. The site is sandy soils with an allowable 2000 psf bearing, and assumed k=50 pci (corrected for footing size/shape). I am analysing the footing as a beam on elastic foundation, by hand, Enercalc, and Staad 2003.
I have a one-way shear overstress of about 3.5 times allowable. So far no signs of failure are evident, except for some isolated cracking of CMU walls, but I am going to recommend doing a field investigation and repair of the footings.
The obvious solution to a shear failure is make the footing thicker, and wider for a one-way shear. However, just making it thicker won't necessary help if I can't get the shear to transfer into the new concrete poured on top of the existing footing.
Can I get this shear transfer if I epoxy in staples along the top of the footing? Do I need to epoxy dowel into the columns as well?
Any other suggestions are much appreciated. Thanks in advance.
I am investigating a concrete frame structure and have discovered the footings are undersized excessively, more than 3 times overstressed. I am working up ways to fix the problem. I can deal with bearing and bending fairly easily, but am having some questions about how to strengthen the footing for both one-way and two-way shear.
I have 16"x16" concrete columns bearing on a continuous strip footing at approx 18' centers. The footing is 4' wide and 16" deep, with a single layer of steel at mid-height. The site is sandy soils with an allowable 2000 psf bearing, and assumed k=50 pci (corrected for footing size/shape). I am analysing the footing as a beam on elastic foundation, by hand, Enercalc, and Staad 2003.
I have a one-way shear overstress of about 3.5 times allowable. So far no signs of failure are evident, except for some isolated cracking of CMU walls, but I am going to recommend doing a field investigation and repair of the footings.
The obvious solution to a shear failure is make the footing thicker, and wider for a one-way shear. However, just making it thicker won't necessary help if I can't get the shear to transfer into the new concrete poured on top of the existing footing.
Can I get this shear transfer if I epoxy in staples along the top of the footing? Do I need to epoxy dowel into the columns as well?
Any other suggestions are much appreciated. Thanks in advance.