So then, there is no load transferred from thrust at the top of the PSV discharge, down the PSV discharge stack pipe, around the elbow, through the PSV, down the riser, now in axial compression and bending, through the reducing tee and finally into and through the mainline and on to the concrete pad below the PSV riser? And I was going to make it XXS.