Nov 1, 2010 #1 JSplanner Civil/Environmental Nov 1, 2010 1 0 0 US All Milestone activities in the schedule are not calulating the Positive Float. The float column either shows the 0 float or the Negative Float but calculates/shows the Positive Float as 0. Please assist.