Suretrack PM - Milestone Positive Float Calculation

Status
Not open for further replies.

JSplanner

Civil/Environmental
Nov 1, 2010
1
All Milestone activities in the schedule are not calulating the Positive Float.

The float column either shows the 0 float or the Negative Float but calculates/shows the Positive Float as 0.

Please assist.
 