JSplanner
Civil/Environmental
- Nov 1, 2010
- 1
All Milestone activities in the schedule are not calulating the Positive Float.
The float column either shows the 0 float or the Negative Float but calculates/shows the Positive Float as 0.
Please assist.
The float column either shows the 0 float or the Negative Float but calculates/shows the Positive Float as 0.
Please assist.