Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Tek-Tips community for having the most helpful posts in the forums last week. Way to Go!

Switching Table for Dehydration Unit

Status
Not open for further replies.

pine05

Chemical
Oct 20, 2010
6
ID
Hi, my name is pine and I'm currently have assignment to create switching table for Dehydration using Mol Sieve.

Our client would like to have the unit able to operate in both 2x100% (1 operate, 1 regen, 1 standby) and 3x50% mode (2 operate at 50%, 1 regen)

My questions are :

1. Lets say that the Adsorption time is 12 hrs, and total Regeneration time is also 12 hrs. If vessel A and B during 0-12 hrs is in adsorption mode, while C is in regen mode, what will happen for the next 12-24 hrs ? As both A and B require to be regenerated, thus only vessel C will be running in Adsorption mode. Is this correct ?

2. What will the design of each dryer be ? is it to be designed to handle 100% or 50% flow ?

Thanks
 
Replies continue below

Recommended for you

You already answered your own question. If A and B are running they are at 50% capacity. So when C is done regenerating it can go on line with one of the other beds while the other regenerates (ie B stays adsorption and C starts adsorption both at 50% while A starts regen).
 
Then you have ran A & B at 100% for 12 hours instead of 50% as you state in your design. So you haven't designed for that scenario and would therefore need a 4th bed.
 
i see now, so when I run the A&B bed for 50% that means the adsorption time which is previously 12 hours (for 100%) will be longer for 50% (say 24 hours, double the time)

is it correct ?

thanks anyway
 
Status
Not open for further replies.
Back
Top