Has anyone addressed the issue of a drilled concrete shaft, highly loaded in tension (tower crane leg uplift) and the type of reinforcing laps required under ACI 318?
Specifically, should a 30 inch diameter drilled shaft, loaded to 1200 kips tension be considered a tension tie, thus requiring mechanical couplers rather than lap splices under ACI 318 Section 12.15.6?
Thanks for the help
Specifically, should a 30 inch diameter drilled shaft, loaded to 1200 kips tension be considered a tension tie, thus requiring mechanical couplers rather than lap splices under ACI 318 Section 12.15.6?