I've recently come across an issue for one of my projects regarding a SWPPP requirement in Texas. The TPDES permit has a published requirement that any site with more than 10 acres of disturbed land 'should' have temporary sedimentation basin(s).
The guidelines for the basin sizing according to the TCEQ (Tex Commish. on Env. Quality) is as follows:
"..must provide sufficient storage to contain a calculated volume of runoff from a 2-year 24 hour storm event"
It goes on to say:
"Where rainfall data is not available, the sedimentation basin must provide at least 3,600 cu. ft of storage per acre drained..."
The guidelines make no mention of the rational method, storage times, release rates, runoff coefficients, or whether it is intended to be detention or retention.
So I contacted TCEQ to get some guidelines but they don't really know or understand the requirement. I've now got a City inspector who wants 'calculations' but can't explain what calculations <snicker>
Anyway, has anyone come across this issue before? The site has no proposed detention pond otherwise it would be a non issue. I figure the intent is to hold the runoff temporarily so any solids can settle out of solution.
The guidelines for the basin sizing according to the TCEQ (Tex Commish. on Env. Quality) is as follows:
"..must provide sufficient storage to contain a calculated volume of runoff from a 2-year 24 hour storm event"
It goes on to say:
"Where rainfall data is not available, the sedimentation basin must provide at least 3,600 cu. ft of storage per acre drained..."
The guidelines make no mention of the rational method, storage times, release rates, runoff coefficients, or whether it is intended to be detention or retention.
So I contacted TCEQ to get some guidelines but they don't really know or understand the requirement. I've now got a City inspector who wants 'calculations' but can't explain what calculations <snicker>
Anyway, has anyone come across this issue before? The site has no proposed detention pond otherwise it would be a non issue. I figure the intent is to hold the runoff temporarily so any solids can settle out of solution.