nour75
Structural
- Jan 28, 2008
- 26
I am designing an industrial framed RC structure that has a vertical steel platform towers attached to the roof (the mass of the steel structure is neglected and not contributing in the main lateral resisting system, just for accessing some steel silo structures for maintenance). The total height of the structure including the vertical steel platform towers is 80.0m, but the height of the RC frames (the main lateral resisting system) is 23.0m. the total height to the center of mass of the steel silos, considering they are full of material, is 34.0m. The seismic zone is 1 according to UBC97 code. In order to determine the period of the structure based on method A, one of my colleagues advised me to use the 80.0m for the hn, and another colleague told me to use the 34.0m, but I am not convinced, and I suggest to use 23.0m instead.
Are there any one suggesting another point of view?
M.Nour
Are there any one suggesting another point of view?
M.Nour