Better late than never:
On one of our projects in east New Orleans, with a positive connection (shear keys welded to the piles) between underwater concrete seal and piles, a 5-foot concrete seal had no problem resisting at least a 33-foot head.
Better late than never:
On one of our projects in east New Orleans, with a positive connection (shear keys welded to the piles) between underwater concrete seal and piles, a 5-foot concrete seal had no problem resisting at least a 33-foot head.