I am working on a pipeline project which includes the use of thrust blocks for lateral resistance and am providing capacities per unit depth. Eg. 160 psf per foot of embedment at midpoint height of the thrust block. My question is we limit the lateral resistance of the soil at a certain depth. 10 feet or so. For example at 10 feet depth or greater we would limit the resistance to a maximum allowable capacity of 1,600 psf. Should we have a limit on the resistance and if so why? The pipeline on this project is up to 30 feet deep.
Thank you for any replies.
Thank you for any replies.