Are there any good design examples out there for CIP facing attached to the front of a soldier pile wall with tiebacks?
I am interested in the direction of shear reinforcement (bent bars) located in front of the piles. I assume that the shear would be opposite of that in the top slab of a box culvert since the loading is in the opposite direction.
any help or thoughts would be appreciated.
JEB