karpiozo
Industrial
- Apr 30, 2007
- 2
Hi lads. If anyone could give me an answer how to get moisture out of the concrete floor 120-150 mm thick to the level of 0,6-1,6% so that i could put timber floor on it, two weeks after it's been poured?
I know that it sounds pretty extreme because you need about 6 months for the concrete to complete dry out.
P.S. Strength of concrete is around 50N/mm2 after 28 days.
I know that it sounds pretty extreme because you need about 6 months for the concrete to complete dry out.
P.S. Strength of concrete is around 50N/mm2 after 28 days.