processengineer1998
Chemical
- Jul 21, 2010
- 36
Dear Friends;
As you know in case of fire occurrence on platform; it is necessary to consider an appropriate time delay to ensure that Emergency shutdown valves(ESDVs) are closed before Blowdown valves are opened to prevent any problem like flare overloading.
I want to know how much the required time and what relevant criteria or standard for this matter is.
Is the time to be considered from time the ESDVs are being closed or it is considered after full closure of ESDVs.
Tnx