AniMhj
Civil/Environmental
- Jul 15, 2023
- 25
Dear everyone,
I am analysing RC building with 26 stories in ETABS. From its modal analysis, the time period of fundamental mode of the building is more than 5 seconds. Is it OK to get such a high time period?
I am analysing RC building with 26 stories in ETABS. From its modal analysis, the time period of fundamental mode of the building is more than 5 seconds. Is it OK to get such a high time period?