pinetti
Mechanical
- Apr 27, 2006
- 14
Hello all,
Using NX2 under TC9.1.2.10
We work with big assemblies up to 12000 parts. My boss insists on having the machine we design totally assamble, which means at some point we have to open the complete assembly. This is about half an hour waiting time, and longer when we have some saving to do or loading errors.
We are working on our procedures to reduce the time, but we also think we could improve a lot with hardware and software changes. For instance, we are considering passing to linux and forget windows alltogether.
Any experience regarding time and big assemblies??
Using NX2 under TC9.1.2.10
We work with big assemblies up to 12000 parts. My boss insists on having the machine we design totally assamble, which means at some point we have to open the complete assembly. This is about half an hour waiting time, and longer when we have some saving to do or loading errors.
We are working on our procedures to reduce the time, but we also think we could improve a lot with hardware and software changes. For instance, we are considering passing to linux and forget windows alltogether.
Any experience regarding time and big assemblies??