ambatiashok
Geotechnical
- May 8, 2016
- 2
Hello,
In a project I have groundwater monitoring (standpipe piezometers) data for 4 months, along with geotechnical recommendations the client requirement is "to establish maximum and minimum design groundwater table with a 1% probability of exceedance in any given year (ie. 1 in 100 year return period)".
Could anyone help on this.
Rgds
Ashok