jayraj
Electrical
- May 22, 2002
- 1
Touch and Step Potential calculations:
I am doing lightning protection design for a commercial workshop building using lightning rods and downconductors all connected to a earthing grid system as per the Australian standards AS1798 (1991).
I have not been able to calculate the touch and step potentials in the event of a lightning strike. Could anyone help, please.
Thanks
I am doing lightning protection design for a commercial workshop building using lightning rods and downconductors all connected to a earthing grid system as per the Australian standards AS1798 (1991).
I have not been able to calculate the touch and step potentials in the event of a lightning strike. Could anyone help, please.
Thanks