Ali
Structural
- Jul 21, 2016
- 2
Hello Engineers,
Recently I was conducting traffic counts using tubes (MetroCount). However, one of the two tubes (which were placed 1 meter apart) were cut. Therefore, the traffic data is now not correct. Theoretically, I was thinking that one tube could be enough (not so accurate) for getting the Class, Volume and Speed. Is there any way I can still extract the data or make a correction for it using the software MTExec?
Thank you.
Recently I was conducting traffic counts using tubes (MetroCount). However, one of the two tubes (which were placed 1 meter apart) were cut. Therefore, the traffic data is now not correct. Theoretically, I was thinking that one tube could be enough (not so accurate) for getting the Class, Volume and Speed. Is there any way I can still extract the data or make a correction for it using the software MTExec?