Hello folks, there is one situation I got and I am into it as a matter of technical interest. A transformer was operated at Open wye - open delta operation. The bank of 3-333kva transfo was busted. An explossion was heard and it shut down the whole plant. After visually inspected and tested, found out that one of the transfo terminal was lossen. They asked a contractor for repair and rewind and it is going to cost them $4,500. What can you suggest about this situation? For any development. This bank 3-333kva transformer is an aged old installation of this industrial plant.