Im designing a deluge system for a 230 kV transformer in a electrical power station, at the moment of calculate area of transformer NFPA 15 suggest the following: "The water shall be applied al a net rate not less than 0.25 gpm/ft2 of the proyected area of a rectangular prism envelope for the transformer and its appurtenances,..." so I most consider ONE big rectangular prism that contains body transformer, radiators and oil conservator tank, in this case its include a non-existent surface area but I guess its a like a security margin. Im doing it fine?