I had one of our installers call with the following question.
Application, The seconday of a power transformer (45kVa 3 ph) the neutral needs to be connected to ground. In this facility the ground wire is commonly bonded to the building steel structure.
Is this common practice or shouldn't the ground be connected at the service point where the power to the primary is derived?
Your thoughts.
Thanks
S Whaley