Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations IDS on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

transformer ratings.

Status
Not open for further replies.

Mlmlzx

Electrical
Feb 3, 2021
57
Dear All:

For a hydropower plant, calculate the transformer loading for penstock valve house, and surge tank?

regards,
 
Replies continue below

Recommended for you

Add up the loads.

I’ll see your silver lining and raise you two black clouds. - Protection Operations
 
thanks david, but hwat all electrical loads will required at damsite and at penstock valve house?
 
It depends. Every design is different.

I’ll see your silver lining and raise you two black clouds. - Protection Operations
 
Depends upon capacity of plant and total operating head . . .

Headgate hoist motors.

Security system, including cameras, motion detectors and all-night flood lighting to deter vandalism, if provided [minimal load].

Additional lights for if the operators or maintenance personnel need to see at night [minimal load, if modern high efficiency lights sources are employed; more if incandescent bulbs are used].

If weather goes below freezing: stilling well heaters to ensure headwater elevation measurements remain accurate; gain heaters to ensure headgates will drop in event of triggering of emergency shutdown procedure, instead of being frozen and not dropping, possibly leading to destruction of unit/plant; space heaters to ensure interior temperature of building is maintained at some small nominal value above freezing.

CR

"As iron sharpens iron, so one person sharpens another." [Proverbs 27:17, NIV]
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor