Guest
Temperature rise test of power transformers
In order to find the winding temperature rise of three phase
power transfomer we need toget the resistance of the winding at the instant of shut down of power.As we can't get the resistance measurement at the instant of shut down we use extrapolating method according to the IEC standard 60076-2:1993.
Could any one with experience in this subject please help us with better explaination of the above extrapolating method.
In order to find the winding temperature rise of three phase
power transfomer we need toget the resistance of the winding at the instant of shut down of power.As we can't get the resistance measurement at the instant of shut down we use extrapolating method according to the IEC standard 60076-2:1993.
Could any one with experience in this subject please help us with better explaination of the above extrapolating method.