lboada
Civil/Environmental
- Jan 26, 2015
- 6
Should a Transient load (like a blowdown force) considered like a Live load or due to its non-steady condition shall be considered as an earthquake load? It seems too conservative to apply the live load factor (1.6) to a blowdown force for the concrete design. Please advise.