With two steam turbine generators(150MW each), sudden arc furnace related load additions of the order of 80MW, 40MW have to be fed, in islanded mode (no grid). Total load say 200-250MW.
i)With boiler rampup rates of the order of 4% per minute or 10% per minute, how the sudden loads of the above order can be catered to by the generators?
ii) For a transient frequency/speed simulation, which is normally s done for only 10-20sec, how the above situation, can be simulated?
iii) Can the above simulation be done with the std IEEE-Gen steam turbine gov model?
raghunath_n00@rediffmail.com
i)With boiler rampup rates of the order of 4% per minute or 10% per minute, how the sudden loads of the above order can be catered to by the generators?
ii) For a transient frequency/speed simulation, which is normally s done for only 10-20sec, how the above situation, can be simulated?
iii) Can the above simulation be done with the std IEEE-Gen steam turbine gov model?
raghunath_n00@rediffmail.com