sngpl
Electrical
- Feb 7, 2002
- 54
We operate a power plant having 5 hydroelectric generators. Over the past 6 years we have been carrying out the following tests, in addition to several others, on these units:
1- Insulation resistance of stator with power cables connected.
2- Insulation resistance of stator with out power cables.
3- Insulation resistance of each phase.
4- Stator winding resistance.
Of course PI has been calculated for all the insulation resistance tests.
What sort of trending should be done in order to produce a formal report for the customer? I mean we can trend the insulation resistance of each unit for these six years, trend the PI of all the units with respect to each other etc. How can we trend the insulation resistance of the units with respect to each other??
Any input shall be highly appreciated.
1- Insulation resistance of stator with power cables connected.
2- Insulation resistance of stator with out power cables.
3- Insulation resistance of each phase.
4- Stator winding resistance.
Of course PI has been calculated for all the insulation resistance tests.
What sort of trending should be done in order to produce a formal report for the customer? I mean we can trend the insulation resistance of each unit for these six years, trend the PI of all the units with respect to each other etc. How can we trend the insulation resistance of the units with respect to each other??
Any input shall be highly appreciated.