Hello, everyone . have got a situation at hand of which i need a clear understanding on the operation of this switchgear(11kv).
The switchgear has seven breakers feeding different units ,of which 1(the CB) is for the incomer ,the other breaker is for the overheard line(11kv) and the other five breakers feeds individual transformers.
Now what happens is that whenever the over headline line breaker trips usually on phase fault ,the incomer trips on earth fault at the same time and the settings on these two breakers are not the same .when ever i try to reset the switch gear using the SFT 2841 sepam software i cant reset the incomer first not untill i start with the overhead line thats when i can succesfully reset the incomer.Now what type of operation or coordination is this???i need clear understanding
0
The switchgear has seven breakers feeding different units ,of which 1(the CB) is for the incomer ,the other breaker is for the overheard line(11kv) and the other five breakers feeds individual transformers.
Now what happens is that whenever the over headline line breaker trips usually on phase fault ,the incomer trips on earth fault at the same time and the settings on these two breakers are not the same .when ever i try to reset the switch gear using the SFT 2841 sepam software i cant reset the incomer first not untill i start with the overhead line thats when i can succesfully reset the incomer.Now what type of operation or coordination is this???i need clear understanding
0