jeannev
Aerospace
- Jul 2, 2009
- 4
There is some disagreement among engineers at my work in the calculation of true position without a diameter call-out. Given an open ended datum notch with the following tolerances:
Width .100 +/-.002
Drop from base of slot to datum surface is 1.267+/-.005
[TRUE POSITION|.006|E|F] (with basic dimensioning to datum points on datums E & F)
When calculating the true position without a diametric symbol is it necessary to double the positional measurement?
ie. if the position checks .0084 from nominal is this a true position of .0084 (.0024 O/T), or is it a true position of .0168 (.0108 O/T)?
Jeanne
Width .100 +/-.002
Drop from base of slot to datum surface is 1.267+/-.005
[TRUE POSITION|.006|E|F] (with basic dimensioning to datum points on datums E & F)
When calculating the true position without a diametric symbol is it necessary to double the positional measurement?
ie. if the position checks .0084 from nominal is this a true position of .0084 (.0024 O/T), or is it a true position of .0168 (.0108 O/T)?
Jeanne