A client installed roof trusses @ 24" oc, but he skiped 2 trusses. So now he has 2 trusses spaced @ 48" oc The inspector won't accept that. The span is 28' and the roof pitch is 7/12. The roof is already installed.
I was thinking of installing rafters and a tie beam, which will be SYP spliced because of the length. What is the best way to splice and is there a recommended length
Any other suggestions?
Thank you