We're in the process of planning a new loading station ( conveyor loading transfer car ,measuring bins then into skips)- the current layout had two conveyors because of the orientation of the existing ore/waste passes- to eliminate one belt we asked engineering to look at the layout again- now the drawing shows one belt but the conveyor is at about a 30 degree angle to the transfer car/neasuring bins- all my expeience has belt in line with the transfer car? anyone have experience with a loadout belt on an angle?