drummingEng
Structural
- Aug 13, 2008
- 11
Please refer to the image. This monorail has a cable running across the top with pulleys. So, essentially a point load at the right of the image and at the end of the left side cantilever.
I am trying to decide what the unbraced length is of the cantilever at the left side. I am finding many conflicting answers that have me baffled as to which length to use. The section used as the monorail beam is (2) MC8x22.8 back to back spaced 2" apart with plates stitching them together every so often. There is a plate top and bottom for additional reinforcing.
I am trying to decide what the unbraced length is of the cantilever at the left side. I am finding many conflicting answers that have me baffled as to which length to use. The section used as the monorail beam is (2) MC8x22.8 back to back spaced 2" apart with plates stitching them together every so often. There is a plate top and bottom for additional reinforcing.