voi
Geotechnical
- Jan 29, 2013
- 25
I have a project of a four level building constructed using natural stones for the walls and the strip footings,beams and floor slab are all constructed in RC. The contractor had founded the building on rock at 1.5 m but after completion it started having large settlement cracks. We were then invited to investigate and we carried out soil investigation which showed as follows in all the three exploratory boreholes. 0 to 1.2 m top soil ( clay), 1.2 m to 2.3m weathered rock, and 2.3 m to end of the boreholes ( 20m ) silty clay. The clay exhibited large volume changes. What is the best way to underpin this building since the traditional method of pit or pier is not possible. The location is in Africa where specialized underpinning contractors are few.