smwpe
Structural
- Aug 20, 2003
- 70
5/1/04
What's your advice on using 3" schedule 80 steel pipe piers in clay subgrade to lift a settled one story house? First a 3" hole, approximately 25 feet deep will be drilled, then the pipe will be pressed to a pressure of 25k +_.
What's the latest data on corrosion of steel piles, and where can I find an internet reference?
Thanks to anyone and everyone who takes the time to answer this.
Smwpe (civil engineer)
What's your advice on using 3" schedule 80 steel pipe piers in clay subgrade to lift a settled one story house? First a 3" hole, approximately 25 feet deep will be drilled, then the pipe will be pressed to a pressure of 25k +_.
What's the latest data on corrosion of steel piles, and where can I find an internet reference?
Thanks to anyone and everyone who takes the time to answer this.
Smwpe (civil engineer)