Arminami
Industrial
- Jan 25, 2016
- 2
I'm working on this Idea and got some results and I need some analysis and consultation on this :
This is the classic and simple way of Feedback control With a Plnet,Setpoint(w),controller(R):
I got the results in graph.
the RED LINE for the controlling Signal u
the BLUE LINE for set point w
the GREEN one for the out put y
now
if we try the bottom model which is the inverse of the above, hypotheticaly we have to get the same controlling signal u but it's not,
what does this mean ?anything about being fast?
how can we discuss the comparison ?
thanks.
This is the classic and simple way of Feedback control With a Plnet,Setpoint(w),controller(R):
I got the results in graph.


the RED LINE for the controlling Signal u
the BLUE LINE for set point w
the GREEN one for the out put y
now
if we try the bottom model which is the inverse of the above, hypotheticaly we have to get the same controlling signal u but it's not,
what does this mean ?anything about being fast?
how can we discuss the comparison ?


thanks.