I am presently writing a procedure for UT Wall Thickness Reference Points.
Searching the web and professional sites, I couldn't find any documentation on this subject.
I have asked many large Oil/Gas Operators if they had a draft of any sort procedure - None seem to exist!!?
OK So I have a 4" pipe that is 200 metres in length - How many UT points should be checked ? Obviously, using the 12,3,6,9 O'clock positions. Does any have any reference standards?
OSP
Dr. Ransom stated that 'Eldil' didn't exist. But we saw them in 'Out of the Silent'.
Searching the web and professional sites, I couldn't find any documentation on this subject.
I have asked many large Oil/Gas Operators if they had a draft of any sort procedure - None seem to exist!!?
OK So I have a 4" pipe that is 200 metres in length - How many UT points should be checked ? Obviously, using the 12,3,6,9 O'clock positions. Does any have any reference standards?
OSP
Dr. Ransom stated that 'Eldil' didn't exist. But we saw them in 'Out of the Silent'.