BigInch
Petroleum
- Jun 21, 2006
- 15,161
I've searched quite a lot for this already, but can't come up with any specific info. Can anybody point me to the right URL directions to get some idea of what facilities and budget would be needed to tie in a 10-20 MW photovoltaic generation station into a 400 kVa Grid (Spain), assuming just overhead lines are somewhere in the vicinity. A typical(?) €/km cost for extending the 400 line to a PV site would also be appreciated.