Engineerd
Civil/Environmental
- Apr 24, 2006
- 30
I am working on a project in which a school and teacher housing will have gravity sewer lines to a lift station. We will eventually turn the system into a vacuum sewer system and the lift station into a vacuum valve pit. Does anyone have any experience with this conversion from a lift station to a valve pit.